We started putting the rafters in last week, and this week we started on the dormer window. We constructed the frame and fixed it in place (having checked the verticals, obviously)…

…and then added the ridge beam to the dormer window (that’s the long horizontal bit that looks like its resting on Mike’s shoulder) along with the two uprights on which it sits.

Once that was in, Mike got a little windy – because the wind was rising – in case the wind caught this beam and sent it sideways, so we quickly added a couple of temporary bracing beams. I don’t tease him for being ‘belt and braces Mike’ for nothing, you know!

We then fitted the first of the rafters to the dormer window, at precisely 58 degrees (or 32, depending on which way you are measuring) which involved cutting two bird’s mouth joints on each rafter, plus a profiled end – it’s no quick job to fit these things in!

Following that, we then added the next three pairs of rafters. We also added some noggins between the first two pairs so be sure that future gusts of wind won’t be able to rearrange these, either – hopefully, or gobeithio, as we say in these parts.

This is how we left it yesterday- partly because the showery weather was bringing out the midges again and we have had enough of being bitten; and partly because we have guests in for the weekend and need to be hospitable. The wood arrived yesterday for the wall plate and the roof valley for the dormer window, so when we return to the building work, we should be able to make smooth progress again…