All rafters now present and correct

Last week, I was away from Plas for a couple of days at a church meeting. As I left, we had completed seven of the eight sections at the top of the party wall…

…and when I returned, we finished the eighth section…

…and then stood back and admired our handiwork! At last, the central wall was finished – and I can’t tell you how much time we have wasted this week as we discover the tool / equipment / consumable we need is on the other side of this wall!!

Some of you may recall that we had a Ukrainian family staying with us a year or so ago. They are planning to return for a few weeks and so…

…we felt we should upgrade our Ukrainian flag (below bottom) which had been flying since 2022. The wind here can be absolutely ferocious so we had expected some damage but were loathe to upgrade it as there was something about its tattered appearance which we considered told a story well. However, we really felt we couldn’t let our friends see that so now we have…

…this new flag, imported from Ukraine, fluttering outside the building.

Having finished the central wall, we now needed to put the final four rafters in place. The reason we had not yet fit these rafters is because we needed to ‘invent’ something for the lower two rafters to rest on. What you see below is the outer wall on the right hand side of the building, at the point where the dormer roof adjoins the rest of the roof. We needed to put two rafters on the right hand side of the roof. Each of these attach to the horizontal steels at their top end, but there was no timber for these to rest on at their bottom ends. We stood, and looked, and sucked through our teeth, and thought hard, and eventually worked out we needed to stack several thicknesses of wood together, bolt them in place, and then attach the rafters to this.

Below you can see we have two of the three blocks in place…

…and then we managed to fit the rafter – and we now have the full complement of rafters in place. Yippee!!

Below you can see all four rafters that we fit today, so we are now one, big, step closer to fitting the slates. Oh be still my beating heart…

Our latest estimate is that we have perhaps a day’s worth of woodwork to complete on the rafters, after which we need to fit four Velux windows into the back of the roof, after which we can start putting fabric and slates on. Not too long to go now…

Leave a Reply