…after yet more days of building stud walls. Here you see the en suite bathroom to the twin bedroom being created…

…and below we have started to fit plywood to the emergency exit corridor.

We then noticed that the weather forecast was showing a week with no rain, so we felt we should swap to doing some of the external jobs. Below you can see that the left hand side of the left hand suite has been Tyvexed and battened, and then we covered it with blue plastic to protect it from the elements – so it was now time to…

…remove sme of the plastic and get slating. If I’m honest, we have been avoiding this bit. Perhaps four years ago, we renewed the roof over the boiler room (the flat grey surface below) and slightly mis-judged where the new building would be – so we have about a 9″ gap which we need to ‘cover’. We have done this by fixing plywood on a slope over the ‘shortage’ and, below, you can see we are now fitting a small slate roof to ensure this gap will not suffer leaks in future.

Once the slating was finished, we fitted lead flashing behind the Aquapanel and over the slates, and then continued fitting Aquapanel up the wall. We removed the blue plastic piecemeal as we worked up the wall, we removed the blue plastic because we didn’t want to be caught out by any thunderstorms that may arrive…

…and here you can see another small detail where we are having to work out what to do. In time, the wall on the right hand side of the picture below will be made taller; the roof it supports will change its height and slope; and so we have to guess where the line of Aquapanel needs to end. I will show more of this in future photos but, for now, let me show you the beady eye of our supervisor…

…as she relaxes after a hard day on the slab.

Now that the intensely hot weather is breaking, perhaps we will be able to do a little more work in the next fortnight?!