And now for the slates

Yes, oh my goodness, at last, finally, and not a moment too soon, we have started on the slates. Of course, before fitting any slates we had to form the lead into valley pieces as below and…

…take them up onto the roof to lie on the valley boards, after which…

…we stood back to check that they are lying as we would wish. You may notice we are starting our slating on the right hand side of the small dormer, which slates will be the hardest to see once the roof is finished, so with any luck we can learn our craft here and any mistakes we make will hopefully never be noticed. With the valley in place we…

…returned to our workshop (or, if you prefer, stood inside out of the rain) and formed the lead so it would fit snuggly over the mopstick which had been attached to the ridge fittings and nailed in place along the top of the dormer roof…

…and carried it up to the top of the roof. Et voila – but, for the moment, we will leave the lead as it is, because it will need subtle movements as we fit the top slates and then fold the lead down over these slates when they have been fitted.

Now with lots of lead in place, we were ready to open the crates of slates and get going…

…having, obviously, paused to fit the fascia boards, since the slates, mopstick and lead need to overlap these slightly…

…and then finally, at long last, we could put in some slates. Here we have laid two full slates, sideways, to form the (I can’t remember the special word) first slates and then…

…we continued, using one and a half width slates on alternate rows at the front edge, so that the appropriate overlap pattern can be formed. This arrangements allows us still to walk to the top on the battens that are exposed, enabling us to put the final slates at the top and then (in due course) bend the lead flashing down onto the slates.

The picture below shows how the trimmed line of slates overlapping the lead valley are shaping up, which we are quite pleased with at the moment…

…but, like I said earlier, when we are finished this particular part of the roof will be relatively hidden from human eyes. We have about another two days work to do on this side, before we can start on the left hand side, but first we will need it to stop raining for a day or so! Today, we are both keen to be outside, but it’s blowing a gale and the rain is travelling almost horizontally, so we will have to wait a few more days before we can progress this. Shame – it’s such fun!!