Better late than never…

… I have finally found some time to update the blog. My apologies – we have had visits from grandchildren, and dreadful weather, and various other reasons why we couldn’t be building – yet even allowing for that, it has taken me a long time to send this update. I hope you will feel it is worth waiting for!

Last time, I was showing photos of us slating the right hand side of the small dormer: below you can see we have progressed to the left hand side.

We made faster progress this time, as we had worked out a better system for trimming the tiles as they run onto the lead valley…

…so relatively quickly we were near the top and…

…after laying the lead roughly in place on the top of the dormer, we moved on to slating the back roof. We started by completing the battening at the extreme edge of the roof…

… and then moved on to the slating, which is very much easier on a shallower slope.

We really enjoyed a couple of days of smooth, effortless slating on the main back roof, and soon found we were close to the gaps we had left for the Velux windows and needed to start fitting the windows.

Last week, therefore, we began trying to fit the Velux window, only to find to our horror that the gaps we had left were not quite big enough!!!!! The maxim “measure twice, cut once” was sadly rued that day. All of the gaps were sufficiently wide, but not sufficiently long to fit the windows. After a brief (but well deserved) panic, we put our thinking caps on and realised we could use a router to lengthen the gap a little, so Mike started doing this (as my wrists are not strong enough for this sort of activity)…

…and once the gap was okayed, we fitting the frame, and then the (surprisingly heavy) window…

…and we enjoyed the moment of completion even more than we normally do.

With that window (and part of its weatherproofing surround) in place, we started slating beneath and to both sides of the window. Pretty soon, we realised we needed to install the next window, because as you slate to the sides you install soakers which need to be interleaved with the slates which will soon abut the next window…

…so we set to work and put the next Velux into place.

We will start putting the next two windows in later this week, but as we still have grandchildren on site, and as I seem to have a staggering number of appointments / meetings / zoom calls at the moment, the rate of progress will probably continue to be relatively slow. But we will soon see…!!