A quick recap – last time, we had just finished the low level rafters at the back. Very soon, we plan to put the next ‘level’ of rafters in place but before that…

…we wanted to install the last of the wall plate. Below you can see the top of the block wall which we needed to finish off by…

…installing the (orange) cavity stop and then mortar either side before…

…placing the pre-prepared wall plate in place. This was then left for several days for the mortar to go off, before Mike drills and installs studding to bolt this plate securely in place. Whilst we wait for the mortar to go off fully we…

…returned to working on the roof. As you can see below, we began by installing temporary flooring over the first floor ceiling joists, and then erected two short towers. The rest of the ridge beam could then be installed in two parts as each part could rest on blocks sited on the towers, which gave us time to adjust the precise height and angle of each element of the ridge beam until we were happy with it after which we…

…added 100mm props in the appropriate places and secured them in place with metal plates. We also stiffened the ridge beam with metal plates at each joint. Once this was finished, we could begin adding rafters – below you can see the extreme left hand and right hand pairs in place before…

…installing the rest of them! It does my heart good to see that lovely line of rafters, all looking roughly in line with each other – anyone might think we vaguely know what we are doing…

…so we had a celebratory hug before getting out of the mizzly rain and returning to the ground floor to…

…admire our handiwork.

Here’s what the roof now looks like – but not for much longer! When this rain stops we will be back out there and…who knows what the next pictures will show?