It’s time for us to add some more walls…

We began by building the side wall in sections…

…whilst Mike cut the last two pairs of rafters to length, adding the bird’s mouths in the correct places.

We erected the studding for the first floor external walls towards the front of the building first…

…followed by those further back. Last weekend we had the pleasure of…

…help from our eldest daughter (I wonder which one that is in the picture below?)

After the mearest blink of an eye, we had the side wall studding in place, with a doorway (in the shot below, obscured by the scaffolding tower) left for the fire exit. We then progressed through…

…to the attic level, and once the studwork was in place…

…we paused to admire our handiwork. You may notice on the front right of the building, you can see the two rafters that sit either side of the external wall, with the noggins in place which supports the piece of 6″ x 2″ which forms the stop of the studwork wall.

Here you can see the studwork in all its glory.

Our next job was to pack the steels by adding first fireboard, then layers of insulation leaving an air gap towards the outside…

…or, in Blue Peter speak, here is one we prepared earlier…

…so that we could now attach the marine plywood to the outside of the structure, becaus the plywood could now be attached across the insulated steel stanchions.

Once the ply was in place, the Tyvex was added, taped together, and then battened in place. Once this was done, it only remained to…

…add some more plywood and then…

…add a little bit more, until we ran out of plywood.

We are pretty pleased with the progress over the last couple of weeks (Thanks, Yvonne and Julie), so will be taking a few days off now to recover, and hope to have more news to share with you in a couple of weeks time!

Leave a Reply