Let’s break out the insulation!

Below you can see we have almost finished the right hand floor and…

…have also floored the attic space which will be open to the bats and…

…a further part of the bat attic – all now with flooring grade chipboard, ready for the bat inspector to walk over it.

Obviously, we finished the right hand floor and started on the left hand suite…

…lifting the temporary flooring just ahead of our progress with the permanent floor. At this point we had a beautifully sunny couple of days and so, obviously…

…we turned to the outside of the building. Mike has now finished putting the jollop between the cement boards and covering it with protective mesh webbing, which means it can last like this for another 12 months before we need to put the render coat over it.

Back inside when the weather changed, we were still working on the floor…

…until we finished the floor, on the same day we had an inspection from Building Control. Fortunately, all was well with the inspection so we then turned to the insulation…

…and before we cut the insulations boards, we put our masks on – the dust from these boards is really irritating if inhaled!

We are putting the 120mm insulation between all the ceiling rafters…

…and below you can see us trying to work out how to do the weird shaped bits…

…and you can see below how we have done all the left hand side weirdness, so only need to repeat it on the right hand side next week.

Yes, it is a little repetitive, and yes we have to do it all again on the left hand suite, but we do both feel like progress is being made – which is great news as we slow up for a while. The Easter holidays are upon us, so we are hoping to be busy with accommodation work, so building work will need to take a back seat for a while.