Last time I wrote, August was still with us, as was the wet weather. We had erected the stud wall in the photo, but still needed the triangular gap to the left hand side…

…to be filled.

Having completed half of the external wall for the left hand suite, we needed further details from the designer so moved over to building the central wall. Below you can see a portion of the dividing wall ready for installation…

…complete with chicken wire backing to stop the insulation (which will be added after the roof is on) from falling out.

Next we constructed a further section of stud wall and…

…stood it on its side to admire it and then…

…installed the second section, after which we…

…stood back and admired both ends, and installed a double joist on the right hand section to hold everything true.

Here you can see we have installed the double joist on the left hand section, along with short lengths of joist, holding everything true and ready for us to move on the the attic floor later.

We then built the third section (of four), at 2.6m long. Standing this up and maneouvering it was slightly trickier than we had planned for, because as we stood it up it started fouling on the joists above, and so we had to have a little re-think. Eventually we worked out that with a little left-a-bit, right-a-bit, left-a-bit shuffling, we would manage to get it in place…

…so now have most of this central section in place. We still have a small section of centre wall to make and…

… once we repeat the joist arrangement here on the right hand end, and install the remaining joists, we can move on to the next part of the project. Meanwhile, as we took our poor weary bodies in for the day, for a gentle sit down and light supper, we found…

…someone else was completely relaxed at the end of her working day!

Lola does do a lovely job of helping us, so we can’t complain when she takes her ease. Speaking of which, we will take our ease today and be back building tomorrow (since the weather forecast is dry) – what a relief!