Now for the twist in the story…

Last time, I explained we were waiting for a delivery of timber to strengthen the timbers we had already installed. We started the week building the attic portion of the stud wall between the two suites…

…but as soon as the new timbers arrived, we added two timbers to the front portion of the dormer ridge beam, and then installed one of the longest rafters to begin to construct the dormer front…

…and then put in its pair, along with one of the next rafters…

…by which time we had got our eye in and out in the rest of the ‘straightforward’ rafters, which felt like real progress!

Next came the tricky bit. At the top of the dormer ridge beam we had the central timber and two valley members, all bolted together. In order to add two further ridge beams, we needed to cut away the top of the valley members – you can see me cutting one away below. We cut this one away horizontally, and the one on the far side (that you can’t see) vertically – which we now know was the better idea.

Once we had trimmed away the valley members on both sides, there was room to feed two further lengths of ridge beam between them. This time, though, instead of having a cantilever structure, we decided (in consulation with the designer, engineer, and building control) to continue the dormer ridge beam through so that it we could attach it to the main ridge beam, which makes the structure much stronger. Having done this, you can see below the props we have put below the joint to give even more strength. This was all a complete no-brainer until…

…we had a site visit from the designer, who spoke with the engineer, and all agreed that as we no longer had a canilever structure, we didn’t need to treble-up the woodwork on the valley members. Hmmm.

Having checked that the builders merchants will take the timber back, we were in two minds about this. Partly, we were happy to have less work to do, but partly we now had a new problem. The way we had cut through one of the valley members (in the photo two above) meant we needed to add a further valley member to which this timber could be attached. If we weren’t going to add timbers, we needed to replace that particular part of the valley member so it could be properly attached. With me still??

Long story short – we disconnected (above) and removed the top part of the right hand valley member, and then replaced it with a new piece with a differently-shaped top end that could easily be bolted to all the other timbers… what a relief.

You can see here – triple timbers on the ridge beam; single timbers on the valley members, all screwed in place, bolted together, and with steel plates and brackets in place to ensure nothing will ever move in future, ever.

Here’s the side view, for those who are interested

…and here’s the view from the attic floor as the larger dormer roof starts taking shape. In a few weeks, when you see the building from the front, you will be able to see (we hope) how these dormers will visually link this refurbished building to the original Victorian building – but for the moment you might need to just take my word for it.

As you might be able to see from the shot above, the rain arrived with a vengeance shortly after we finished repairing the valley member, so we packed up for the weekend. Next week we will be trying to work out how to cut the bird’s mouth onto rafters sitting at 90 degrees to the ridge beam, at 60 degrees from the vertical, hitting the valley members at 29 degrees… easy peesy lemon squeezy just doesn’t quite describe it.