Now watertight, and starting on the floors…

We started the fortnight by installing the back doors. Below you can see Mike checking the position of the frame for the left hand back door…

…before squirting silicone sealant next to the black glazing strip before installing the double glazing unit…

…and after doing it all again, here is the back door to the left hand suite.

We then repeated the process for the back door of the right hand suite which is considerably bigger. It took some care to get the frame outside of the space for it…

…but I worry we have shown you more than enough details of installing these doors now, so I move straight to the finished item below.

With all the ground floor external windows and doors in place, we have moved up to the first floor. We lifted the temporary flooring to allow the joists to fully dry out, and are now ready to lay the floor. As this is a steel-framed building, we need to use special sound-deadening materials in strategic places, so after Mike had cleared out the excess mortar on the wall plate…

…we started putting the green Hush materials in place on each joist, and the rubberised Hush tape (the brown material below) over each steel and then…

…began cutting and fitting the tongued-and-grooved chipboard flooring. Each sheet is carefully glued to its neighbour, and pushed tight against a sound-deadening material stapled to the walls. The floor is then left ‘floating’ meaning we haven’t attached it to the joists, which should also help minimise any sound transmission within the building. And in case this description isn’t nerdy enough for you…

…I must share this photo with you. A few weeks ago Mike parted with the outrageousl sum of about £15 in Lidl and bought a gadget for use when installing doors. It is a platform on a ratchet so you can position the bottom of the door on the platform and then ratchet the door up to the desired height, and once the hinges on the door line up with the space for the hinges on the frame, you can screw it easily in place.

It turns out it is also very useful for pushing the floorboarding securely into position. This gadget will pay for itself many multiple times before we are finished!

Earlier today, we fitted the firedoor that will lead to fire escape stairs in due course – and you can be sure we used the door fitting gadget described above when fitting this door! We then screwed the door shut, so that no-one can try to exit this way until after the stairs have been fitted.

Finally today we share this shot of the first floor so far. This is in the right hand suite (with insulation waiting to be installed soon) and the floor is approx one quarter finished tonight.

When we return to work, we will need to work out quite how to post these floor boards (roughly 8 feet by 2 feet) up onto the attic floor, as there isn’t much headroom on the attic floor level. We will let you know how that goes next time!

2 thoughts on “Now watertight, and starting on the floors…”