If you are beginning to get a sense of deja vu from our photos, that will be because we are now completing the right hand suite, having completed the left hand suite in 2024. Last week, we started putting in the ceiling joists…

… until we had completed the central section of joists, which is also helping to brace the steel stanchions in place.

That night there was a heavy frost, so we continued with the timber work., and began constructing the right hand side of the central wall. This was made in four sections, mostly to ensure each section is not too heavy to lift, and after covering with chicken wire (which will eventually support the sound insulation)…

…we pulled it upright and then ‘walked’ it into its place in the wall. Two further sections were built and moved until…

…the last section remained to be put in place. This was ‘walked’ across to the centre, lifted in place, and then…

…after Mike gave it a final technical tap, it was screwed in place. Once that was done, we then had a wall onto which we could fit joist hangers to complete the ceiling over the stairs.

Here you can see we have installed two double joists and then…

…the ice had melted sufficiently that we could have a go at completing the wall at the back of the suite. I’m not sure if this snap shows – we are one course of bricks short on the outer leaf, and there is rather a hole in the wall about level with where the tools are lying.

Here we have completed about half of the outer leaf, and have filled the hole…

…and I decided it was time for a quick sit down…

…before we moved to the furthest corner of the roof to continue making up the short walls.

This work all now needs to be left for a day or two to fully harden off whilst we…

…moved the wall plate timbers up, ready to be put in place in a week or so. If I look a little weary, it is because those timbers (especially when wet, which they are) are pretty hefty. Mike and I picked them up from the ground floor and carried them to the base of a ladder. Mike then hoisted his end up one rung at a time whilst I simply stood holding the other end, until Mike’s end was above the first floor floor, at which point we pushed the timber through the ladder and the gap in the floor behind the ladder. Once enough had been pushed through, I held it in place whilst Mike raced up the ladders and pulled on the timber, before I ran up the ladder to join him, and moved the timber to its temporary position. Simple. If you think that sounds hard work…

…it was!! Earlier today we finished the joists over the stairwell, so the ceiling joists are complete. Mike is now off skiing for a few days, so the next post might be rather different from our usual fair.