Our second roof is now taking shape…

Our first task this fortnight was to finish stapling Tyvex to the back wall, to protect the plywood from the rain (and yes, we do sometimes have rain in North Wales…)

…and then it was finally time to start the larger of the two dormer windows. Below, you can see we started by cutting and fitting the left hand side of the window surround…

…and then continued to put the right hand side and top rail in place. These were then stabilised by adding temporary props behind the verticals, and then a further stud and noggin to the outsides of the two verticals. At this point, we needed to start one of the most difficult parts of this entire process: fitting the valley members.

Each valley member needed to be joined in the middle, so we started by cutting joints at one end of each piece of timber and then…

…cut out the birds mouth that will sit over the purlin at about the half way point. This birds mouth has to be cut at an angle as the timber will be running at 31 degrees from the horizontal, and also at an angle from left to right across the building – so the birds mouth needs to be very carefully cut!

All that scratching our heads was worth it. We installed the top half of the valley member by screwing an eye hook attached to rope into the top of the timber and then hauled it up until the birds mouth locked into place. Once that was done we…

…temporarily attached the bottom half of the valley member in place so we could mark it and trim the end to the required length, at the appropriate angle, and then fix it in place. Phew.

Today we returned to work to cut and fit the right hand valley member, as you can see below. The top ends are still loose as they will need to be joined to the ridge beam, but that is not being delivered until tomorrow…

…so we stopped work early this afternoon shortly after I took this photo, to show how the new roof line on our refurbished building should echo that of the old building. Obviously, it will be clearer in a few more weeks, but I hope this helps for now. Just before I finish though, I would like to share with you…

…this lovely rainbow which I photographed from the back of the building site last week.

Every day, I am reminded that the view from our building site has to be one of the best in the country!!