Our slates are still at the docks…

…but the material to cover the party wall has finally arrived! The weather had been against us, but today it finally blessed us with a dry day, so we got to work! We started by attaching the white part of the fire stop to the top of the party wall, and then began to remove the blue plastic we had used as a temporary measure to keep parts of the roof dry. Sadly, on looking carefully, we found…

…a beautiful but very large and active wasps nest under the plastic. As one of our roofing team is allergic to wasp stings, this had to go – so Mike popped to the shops and came back with something to deal with the problem, whilst I did some ironing. Once the nest had been dealt with…

…the roofing work could begin. We put a length of eaves protector in place, then started adding the roofing fabric. Over the roofing fabric we then placed the red part of the fire stop in place and nailed it under the battening – which makes it very obvious the appropriate fire stop is in place.

Hopefully the picture below shows how this is all sitting just over the central wall and, in the event of a fire, it should prevent fire passing from one suite to the other under the slates.

By the end of the day, we had progressed this far up the roof.

The sharp eyed amongst you may notice that we are now using a second type of roofing felt. Up to now we have used modern roofing felt, but today we started using the old fashioned bituminous felt. There had been a bat in the roof of the old building, so part of the new roof will be a bat roost. Bats are safe in roofs with bituminous felt, but they can get entangled in the modern roofing felt so this cannot be used in the bat-accessible part of the roof. I hope that all makes sense!

We are having a few days away this week, but will get back to the roof as soon as we can on our return…

Leave a Reply