As we are still busy with guests (for which we are very grateful) we have limited time for the building work so progress is a little modest. Below you can see we have finished cladding the side wall with Aquapanel and have decided to…

…continue out wall cladding on the front wall. Months ago we added the plastic to protect the Tyvex paper from UV light so the plastic was removed and…

…after allowing a little time for everything to ‘air’, we started adding the horizontal battening ready to support…

…the Aquapanel pieces on horizontal and vertical battening.

The process is now quite slick. Mike measures and I cut the panels to size; Mike screws a few of the very special and quite expensive screws into the top of the board…

…and I hold the 4mm packing pieces in place before the panel is positioned, to ensure a sufficiently large and even expansion gap is left between the panels, and Mike then turns the ready prepared screws into place, quickly transfering the weight of the panel away from my hands!.

In some places we have had to add more vertical battening in order that the vertical joints don’t line up…

…and we are both pleased that the panels make the site look much more building-like than the plastic covering did.

The picture below shows the upper extent of the panel boards we plan to put in now, and behind you can see multiple pieces of battening. Itime, these will support rafters forming the veranda-style roof, and lead will be inserted above to keep everything watertight – but that’s all for another day!

Over the next few days we will continue with this panelling work and hopefully the front wall will start really looking better for this work soon…