I will leave the ‘big’ news until the end of this post. In the meantime here’s a shot of Mike marking the end of the ridge beam for the dormer window, which needs to be cut away to fit between two valley members.

Once it had been marked and cut, we lifted it into place and then measured and cut the prop to support it. You may notice that we have cut the end of the beam ready to form a joint with the next portion…

…which we cut for length, cut the joint, and then lifted into place. It was temporarily supported on the plank at the top of the scaffolding tower whilst we checked it was horizontal, measured how far it was above the timbers over the window frame, and then cut and fit the prop.

At this point, we drew in a deep breath, thinking we had completed this part of the operation. And relax.

We took this photo, to remind us all that the intention was always to make the ‘old’ single-storey extension (which looked like a random bungalow attached to a fine building) look more like it belonged by mirroring the roof line of the Victorian portion of the building.
We then went in to check the plans to find out what we needed to do next, and found – to our horror – …

…that the plans had recently been updated to show we needed three timbers in each place for this dormer part of the roof, rather than the single timbers we have put in place.

Oh. Oh dear. There was a moment there when I was worried that we would need to take down all that we had done. Catastrophizing, me??? Fortunately, after a few deep breaths, we realized that we ‘simply’ needed to order more timbers and add one on either side of the five large timbers we had already put in place.

We ordered all the timber, but it won’t arrive for several days so, in the meantime, we added tripled-up the props we had already installed, so that they are ready to receive the additional timbers (hopefully) next week.

Here’s hoping that fitting these additional timbers turns out to be as straightforward as we hope it will be!