That there floor still needs laying

The first floor for the right hand suite continues to develop, but these floor boards are heavy to move around.

So when I skipped off this week to do some church business, Mike turned his skills to fitting the insulation, because the insulation boards are far, far lighter!

When the first floor was almost finished, we had to stop laying that floor so that there was still sufficient room to pass floorboards up to floor the attic.

You can see below that we passed some boards up into the attic…

…and began to lay the floor up in the attic. The attic on the right hand suite is the one that will be open for bats to enter, so this floor must be safe for the bat inspector to walk on, which is why it will be the same specification as our first floor flooring.

Meanwhile, Mike has moved his focus to the insulation – isn’t he doing a great job!

Now that I am back, we have returned to flooring the attic. We made great progress today, but had to stop at the point you see below, as we need to pass many more boards up to the attic, and we risk not leaving enough space to pass the boards through. And in case you were wondering, we have used all the boards delivered the first time and earlier today…

…had to carry all these boards from the car park into the left hand suite. If I had realised when we took on this task how much of my time would be spent moving heavy materials around, I might have thought again.

On the other hand, we are still having a lot of fun doing this, so no need to chage anything now, right…?