The work to weather-proof the suites continues…

We are continuing to install all the exterior windows and doors in the new suites, which – as you may know – involves me in a lot of painting. Below, you see yet more doors that have been undercoated before installation.

Last Friday, we popped out for the morning, and returned home to find 144 sheets of insulation board in the car park so we set to and…

…moved it all into the right hand suite.

The next big task will be the fire doors that need to be fitted on the first floors of each suite, once we have finished…

…installing the ground floor windows and doors. Here you see the void for the frame – with the frame in the foreground, already undercoated…

…and here the same view from outside.

.Below, you can see us levelling off the base of the doorway awaiting the fire door, a piece of work that has been exercising us for about three years. When we put a fibreglass flat roof over the boiler room (to replace the very leaking conventional flat roof) several years ago, we had to ‘guess’ where the wall of the suite would be, and ensure the flat roof finished before that point.

The wood to the right hand side below (with Mike’s hand on it) has been placed here to cover the gap between the edge of the suite’s wall, and the edge of the flat roof. What’s 6″ / 150mm between friends? Anyway, problem solved and now we can sleep better at night!

Back to the downstairs doors. You can see that we have fitted the frame; glazed the left- and right-hand panels; and hung the doors. However, the glass supplied for the doors turned out to be 50mm too narrow, so we have to wait for the new panels to be delivered. Meanwhile I have undercoated the fire door frame (laying down in the picture below).

We also used the time to finish the doorways to take the back doors to the suites. When we cast the concrete floor, we raised the level of blocks on the inside, and now need to put in a row of blocks to form the outside leaf of the wall, for both the left- and right-hand suites. Sadly, it has been so rainy since we put the blocks in that we are still keeping the blocks covered in plastic to keep the rain off.

Now its the weekend, which should allow plenty of time for the paint to dry, before we return to this project early next week.

One thought on “The work to weather-proof the suites continues…”

  1. You two are amazing , working your way through the painting Carrie and what a surprise to return home to find that huge delivery Mike

Leave a Reply

Your email address will not be published. Required fields are marked *