Early last week we put in the third Velux window (the one on the right below)…

…and then slated above the first window…

…and then moved along to slate over the second window. Our system seems to work pretty well: Mike carries the slates from their crates up to the first floor, then posts them to me through the window frame, and I nail them in place. Copper nails, natch.

We thought long and hard about putting the fourth window and frame frame in place. Once in place, all of the roof can be slated; but once in place, it will be challenging to climb from the window onto the roof…

…because the area slated around the window takes away the footholds by covering the battening.

We decided to install the last window, so can now slate all the roof, but will need to find a different way of accessing the roof next week…

… but have no fear, we have a plan.
We are both very pleased, and a little weary, following the installation of the windows – which were surprisingly heavy to install – and hope to be able to show you more progress soon!


Everything coming along nicely, you are doing a fantastic build
Thanks for the encouragement – and hoping that tonight’s post looks as good to you as it does to us!!!