…as we continue to try to get our work under cover. Here you can see Mike nurdling the roofing fabric that will sit under the valley board into place…

…after which we installed the valley boards (the wide yellowy bits of wood you can see further down the blog) and then began putting the roofing fabric and battens onto the right hand side of the small dormer in the picture below.

The next picture might be hard to work out, so here goes. Below you can see where the valley board on the left hand side of the dormer runs, and on the right hand side of the picture you can see the valley board needs extending until it touches the left hand side. You can also see how we have fitted many of the battens on the side of the dormer. The ‘finishing touch’ is that you can see along the ridge of the dormer we have started installing the ridge batten clips which will, later, hold the top batten and the ‘mop stick’ moulding which will support the lead on the ridge. I will be asking questions later…

In the next picture you see evidence that I do sometimes manage to stray in front of the camera, rather than staying well behind it, as I climb the dormer to help fit bits of batten.

Then the camera changed hands and I snapped Mike fixing the last of the ridge batten clips on the small dormer ridge.

The following day, we focused on a job we have been meaning to do for months. Last year, we put fabric on the far left hand side of the roof, but didn’t have any ridge batten clips to fit at the top. Now we had these, we could go back and finish the ridge. We trimmed away some of the loose fabric that has been severly beaten during the winter storms; then put new roofing fabric over the top; then fit the ridge batten clips; and finally put the last two battens in place to hold everything firmly in place.

This is fantastic news, as it now means the left hand side of the building should begin to dry out properly. Below you can see that we then put roofing fabric and battens to the left hand side of the central roof, right up to the ridge…

…and the shot below shows what remained to be done of the right hand side.

Today we tackled the top of the central section, working steadily up and across, now using bituminous felt on the roof since the right hand side will be open for bats…

…and this closer shot I hope shows that we have nearly worked our way across to the top of the large dormer.

When we get back to building work next week (as we have a very busy weekend with guests) we will put fabric out for under the valley board, then fit the board that runs along the valley towards the top of the right hand roof, and can then put the rest of the roofing felt in place on the front of the roof.

And we had better get a move on as all the slates were delivered this week! I keep telling myself it won’t be long before we have this roof finished, but there still seems to be quite a lot fo do before the lead can finally go on!!